Groundworks calculators

Everything below the surface. Concrete and gravel are ordered by volume and weight rather than by area, which is why groundworks is where a material budget usually goes wrong.

Calculators in this cluster

What this cluster is for

Groundworks is the layer that is buried before anyone takes a photograph. It covers three related jobs: the sub-base under a paved surface, the concrete in a slab, footing or base, and the loose aggregate that goes around a drainage run. The two calculators here answer the two questions that actually block a job: how many cubic metres of concrete, and how many tonnes of aggregate.

Both are volume questions wearing an area costume. A patio is measured in square metres, but MOT Type 1 is sold in tonnes and the figure that matters is area × compacted depth × bulk density. Concrete is worse: the wet volume you pour is not the dry volume you mix, because sand, cement and aggregate bulk up when they are loose. Get either wrong and the error is not small — it is several bulk bags or half a cubic metre.

What usually goes wrong

What to order together

Related clusters

Cross-links here are contextual, not a second home: each calculator belongs to exactly one cluster above.