Your measurements
Results
Your quantities appear here
Fill in the measurements above — your quantities appear here as you type.
- Quantities rounded up, ready to buy
- A shopping list for the whole job
- A plan drawn to your measurements
Your shopping list
| Material | Quantity | Notes |
|---|
Spec Check
Material notes
Calculation basis
What this page assumes before you type anything, and how the answer is rounded. Every value below is this calculator's own default: change the box and the answer changes with it.
- How many?
- 1 pourset the number of identical pours
- Waste / tolerance
- None on this pageThere is no waste box: the ready-mix uplift is a fixed +5%, and a site mix is solved from its own ratio.
- Rounding
- Volume to 3 dp; bags and tonnes upa ready-mix order carries a fixed +5% uplift
- Last reviewed
- 25 September 2026checked against this page's own defaults
Confirm quantities against your actual product and site conditions before ordering — standard sizes vary between suppliers, and the ground the material lands on is yours, not ours. Figures are planning estimates, not a quote.
How the concrete calculator works
First it works out the volume you are filling, in cubic metres. For a rectangle that is length × width × depth; for a round post hole it is π × radius² × depth. Multiply by how many identical footings you are pouring and you have the wet volume — the amount of finished concrete you need in the hole. A 4 m × 3 m slab at 100 mm is 1.2 m³.
Then comes the part that catches people out. Cement, sand and aggregate are measured dry, and the dry materials occupy roughly 1.54 times the volume of the finished concrete. That is the standard bulking allowance, and without it every mix comes up short. So 1.2 m³ of concrete needs 1.85 m³ of dry material.
That dry volume is then split by the mix ratio. For 1 : 2 : 4 there are seven parts, so cement is 1/7 of the dry volume, sand 2/7 and aggregate 4/7. Converting to weight at typical UK bulk densities — 1,440 kg/m³ for cement, 1,600 kg/m³ for sharp sand, 1,500 kg/m³ for ballast — gives 380 kg of cement, 845 kg of sand and 1,584 kg of aggregate: 16, 34 and 64 bags of 25 kg. Water is estimated at a water-to-cement ratio of 0.5, which is about 190 litres for that slab.
Which mix should I use?
C20 (1 : 2 : 4) is the sensible default for shed bases, patio slabs, paths and general footings. C25 and C30 are stronger, more cement-hungry and used where structural strength matters — always follow an engineer's specification if you have one. Blinding and mass fill (1 : 4 : 8, 1 : 3 : 6) are lean mixes for levelling under a slab or filling deep trenches where strength is not the point.
Ready-mix or mix it yourself?
As a rough rule, under about 1 m³ is easier with bags and a mixer; over that, a ready-mix wagon usually wins on both time and money, though suppliers have minimum loads and charge for part loads. The calculator shows both routes with a 5% over-order on the ready-mix figure, because running out mid-pour is the expensive mistake.
Depth, curing and reinforcement
A garden path is typically 75–100 mm, a patio or shed base 100 mm, a driveway 150 mm with mesh, and strip footings usually 600–900 mm deep below ground level onto firm subsoil. Concrete gains most of its strength in the first week, so keep it damp — cover it and water it — for at least seven days in warm weather. Do not let it dry out too fast, and do not work it before it has cured.
Worked example: a 4 m × 3 m slab
A 4 m × 3 m slab at 100 mm deep in a 1:2:4 mix — 1.200 m³ of wet concrete.
How we got there
- 4 m × 3 m × 100 mm = 1.200 m³ — Length × width × depth gives the wet volume: 1.200 m³.
- Dry material: 1.848 m³ — A 1:2:4 mix needs 1.848 m³ of dry material to make 1.200 m³ of wet concrete.
- 380 kg cement = 16 bags — One part of cement in seven: 380 kg, which is 16 × 25 kg bags.
- 34 bags of sharp sand, 64 bags of ballast — Two parts sand and four parts aggregate — 34 and 64 bags of 25 kg.
- Water: 190 litres — Mixing water is around half the cement weight by volume.
- Ready-mix alternative: 1.26 m³ — Ordered as ready-mix, allow 1.26 m³ — roughly 3.02 tonnes.
What you need to buy
The order for the worked example above, straight from this calculator's own shopping list.
- Ready-mix concrete (1:2:4) — 1.26 m³ (One line if you are ordering a wagon — includes 5% over-order.)
- Cement (25 kg bags) — 16 bags (For mixing on site.)
- Sharp sand (25 kg bags) — 34 bags (≈ 845 kg.)
- Ballast / 20 mm aggregate (25 kg bags) — 64 bags (≈ 1,584 kg, or 2 bulk bags.)
- Water — 190 litres (Add gradually — too much water weakens the concrete.)
- Steel reinforcement mesh A142 (4.8 × 2.4 m sheet) — 2 sheets (Rule of thumb: a 4.8 × 2.4 m sheet covers about 11.5 m², and the sheets lap one full square, so 1.12× the area is ordered. Mesh is only needed where the slab is meant to carry it — a plain garden-shed slab on firm ground may need none, and a footing is designed its own way. Confirm it against the design, not against this line.)
- Mesh spacers / chairs — 24 spacers (Rule of thumb: 2 per m² to hold the mesh in the middle of the slab. Mesh lying on the ground or on the membrane reinforces nothing — it has to sit in the concrete.)
- Tying wire (1.6 mm coil) — 1 kg (Rule of thumb: about 1 kg per 20 m² of mesh, to tie the laps. Soft annealed tying wire, not a heavier gauge.)
- Expansion / perimeter joint filler board — 14 m (Rule of thumb: the slab perimeter, 14.0 m here, standing against walls, kerbs, a manhole or an existing slab. A slab pinned all the way round cracks somewhere else instead.)
Figures for the worked example only. Change the measurements above and the list recalculates.
Waste and over-ordering
Concrete is ordered as a volume, so the allowance is for spillage and an uneven sub-base rather than offcuts. Ready-mix is batched in part-cubic-metre steps and generally has a minimum load, so check the supplier before ordering an exact figure.
Concrete FAQs
How much concrete do I need for a 4 m × 3 m slab at 100 mm?
1.2 m³ of wet concrete, or about 1.26 m³ of ready-mix once the 5% over-order is included — roughly 3 tonnes. Mixed on site at 1 : 2 : 4 that is 16 bags of cement, 34 bags of sharp sand and 64 bags of 20 mm aggregate, plus about 190 litres of water.
How many bags of cement are in a cubic metre of concrete?
At a 1 : 2 : 4 mix, roughly 13–14 bags of 25 kg cement per cubic metre of finished concrete (about 317 kg of cement). Leaner mixes use less cement; stronger mixes use more. The calculator gives you the exact figure for your mix and volume.
Should I use ballast or separate sand and aggregate?
Ballast (also called all-in aggregate) is a pre-blended sand and gravel mix, and it is what most DIYers should use — fewer bags, fewer decisions. It is usually supplied at a 1 : 2 sand-to-gravel ratio, which suits a 1 : 2 : 4 type mix reasonably well when combined with cement. Separate sharp sand and 20 mm aggregate gives you exact control over the mix, which matters on structural work.
How deep should footings be?
For garden structures, footings typically go 600–900 mm below ground level, and they must be on firm, undisturbed subsoil rather than made ground. Depth depends on the soil and on what is nearby — trees, drains, existing foundations. If it is attached to a building or anything structural, get it specified properly by an engineer or building control.
How long before I can walk or build on it?
You can usually walk on a slab after 24–48 hours and drill or fix into it after about a week, but it continues to gain strength for weeks. Keep it damp and covered for the first seven days, and give it a full 28 days before loading it heavily or building on it.
Regs & planning for this calculator
The volume is arithmetic. The mix is a specification, and the structure is a design.
- BS 8500 and BS EN 206 — mix specification The regulations point at BS 8500 for the concrete mix: Approved Document C specifies mixes ST 1, ST2 and ST4 by name. Read the requirement.
- Approved Document A — structure Loading, ground movement and the Eurocodes that structural design is carried out to. Read the requirement.
- Planning and building regulations exemptions Whether the structure needs planning permission at all, and the Schedule 2 exemptions from building regulations. Read the requirement.
Planning more than one job?
Planning more than one job? Combine your calculations into one shopping list.