BS 8500 and BS EN 206 — how concrete is actually specified

The building regulations do not tell you what concrete to use. They point at BS 8500, which is the British Standard that turns a job into a specification a supplier can deliver.

What these standards are

Concrete is specified, not guessed, and the two documents that do the work are:

In other words BS EN 206-1 supplies the framework and BS 8500-1 and -2 are the UK's complementary documents that make specification practical in a British context — which is exactly the wording the British Standard's own title uses: "Concrete. Complementary British Standard to BS EN 206-1".

Where the regulations send you

This is not a nice-to-have. Approved Document A lists BS 8500-1 and BS 8500-2 in its Section 1 references, and Approved Document C uses them directly:

So the designations ST1, ST2 and ST4 are not trade slang — they are the standardised mixes the approved document points at. If you are building something that has to satisfy building control, the mix is part of the specification, and the mix designation is what the supplier needs.

Why a designated mix is different from a ratio on site

A volumetric mix on site — "1 : 2 : 4" — controls the proportions of the materials you tip into the mixer. A designated mix controls the properties of the concrete: its strength class, its exposure resistance, its maximum water/cement ratio and its cement content. Those are different promises. Two site mixes with the same nominal ratio can land on either side of a strength class depending on the sand, the aggregate and the water, which is why the standards exist.

That has a direct consequence for ordering. A designated mix is specified by the properties you need, and a supplier delivers it to that specification. It is not something a materials calculator can derive from your dimensions, and we do not pretend otherwise.

What this means for a calculation

Edition status — what the approved document cites, and what is current

An approved document names the edition of a standard that existed when it was written. That edition is not necessarily the current one. The table below sets out, for every standard this page relies on, the title as published, the edition the approved document cites, and the edition BSI catalogues today (22 September 2026). Where the cited edition is withdrawn, the page says so; where we could not confirm the replacement, no current edition is stated.

Standard → title as published by BSI → the edition cited by the approved document → the current edition (BSI catalogue, checked 22 September 2026)
StandardTitle as publishedEdition cited by the approved documentCurrent edition (BSI)
BS 8500-1Concrete. Complementary British Standard to BS EN 206 — Method of specifying and guidance for the specifierBS 8500-1:2006+A1:2012 — cited in Approved Document A, Section 1BS 8500-1:2023 — Current (30 November 2023)
BS 8500-2Concrete. Complementary British Standard to BS EN 206 — Specification for constituent materials and concreteBS 8500-2:2006+A1:2012 — cited in Approved Document A, Section 1BS 8500-2:2023 — Current (30 November 2023)
BS EN 206-1Concrete — Specification, performance, production and conformity. Part 1: Performance, requirements, factory production control and assessment criteria for individual valuesBS EN 206-1 — cited by Approved Document C as "BS EN 206-1 Method of specifying and guidance for the specifier" and by Approved Document H as "BS EN 206-1:2000"BS EN 206-1:2026 — Current (31 March 2026)
BS EN 206-2Concrete — Specification, performance, production and conformity. Part 2: Conformity assessment and certificationNot cited by an approved document on this siteBS EN 206-2:2026 — Current (31 March 2026)

Source: BSI catalogue records read at knowledge.bsigroup.com on 22 September 2026. Each title, designation, status and date in the last two columns was read from the BSI catalogue page for that standard.

Last verified 22 September 2026. Every requirement quoted on this page was read from the primary source listed below on that date, not from a summary. If a figure could not be confirmed in the primary source it is not on this page.

Where these figures come from

Guidance only, not advice

This page is a plain-English summary of published regulations and standards, written to help you plan a job. It is not professional advice, it is not a substitute for the actual document, and it is not a building-control decision.

Building regulations are enforced by your local authority (or an approved inspector) and the facts of a particular job can change the answer. Confirm with your local building control before you start work, and where a job is structural, get it designed by a suitably qualified person. If this page and the source document disagree, the source document wins.