How many paving slabs do I need?

Slabs, sub-base and bedding sand in one go — paving is a three-material job, and the MOT Type 1 is the part people under-order.

Your measurements

Patio
Metres. Measure the finished paved area, not the hole you dig.
Metres. For an L-shape, split it into rectangles and total the slabs.
mm. 10–15 mm is typical. Joints are included in the slab count.
Construction layers
mm compacted. 100 mm for a footpath or patio, 150 mm for anything a car parks on.
mm. 30–50 mm is the usual bedding depth.
%. Extra slabs for cuts and breakages. 10% is sensible for a simple rectangle.
Quick presets

Rules of thumb for a typical job — assumptions, not measurements of yours. Pick one to fill the matching boxes; you can change any of them afterwards.

  • DIY figures assume 10% waste: cuts, breakages, and a layout not set out before the first slab goes down.
  • Trade figures assume 5% waste: the slab grid set out first, with cuts made by disc cutter.

The boxes start with our standard figures. Pick a preset, or type your own.

Results

Your quantities appear here

Fill in the measurements above — your quantities appear here as you type.

  • Quantities rounded up, ready to buy
  • A shopping list for the whole job
  • A plan drawn to your measurements
Patio plan with the slab module marked out A rectangular patio in plan, dimensioned length and width, with the slab grid drawn on the slab plus joint module and the sub-base and bedding layers named underneath. Fill the form in and the plan redraws with your slab count. Patio plan — slabs on the moduleslab + joint moduleLength LWidth WSlabs across = L ÷ (slab + joint), rounded up; same down the widthLayers below: MOT Type 1 sub-base, then sharp sand bedding
Patio plan with the slab grid on its module (slab + joint). The drawing redraws to your own patio as you fill the form in.

Calculation basis

What this page assumes before you type anything, and how the answer is rounded. Every value below is this calculator's own default: change the box and the answer changes with it.

Slab size
600 × 600 mmthis page's own default
Joint width
10 mm joint
MOT Type 1 sub-base
100 mm MOT Type 1 sub-basecompacted, the default
Sharp sand bedding
40 mm sharp sand bedding
Waste allowance
10%
Rounding
Up to the next whole unitslabs round up; tonnages are shown to 2 dp
Last reviewed
25 September 2026checked against this page's own defaults

Confirm quantities against your actual product and site conditions before ordering — standard sizes vary between suppliers, and the ground the material lands on is yours, not ours. Figures are planning estimates, not a quote.

Don't forget — check before you order

On this patio the calculator returns these as estimates or optional extras rather than a fixed quantity, so they are listed here instead of being counted into the shopping list. Each one is the calculator's own wording.

Delivery access and what to do with the surplus are the two things that cause a second trip. Neither has a quantity here, because neither is a material.

Save, share or print

How the paving calculator works

Slab counts are worked out on the module — the slab plus its joint. If you are laying 600 × 600 mm slabs with 10 mm joints, each slab effectively occupies 610 mm. The calculator divides the length by that module to get the number across, does the same for the width, then multiplies the two together. A 6 m × 4 m patio comes out as 10 slabs across by 7 down, which is 70 slabs, plus 10% for cuts and breakages — 77 slabs.

Joints matter more than people think. Widening the joint from 10 mm to 15 mm on a large patio can push you into an extra slab per row. And the calculator does include the joints, which is why the answer can be one slab more than a simple area calculation suggests.

Sub-base: the layer people forget

MOT Type 1 goes down first, and it is the reason a patio stays flat for twenty years rather than two. For a footpath or a patio that only sees people and garden furniture, 100 mm compacted is fine. Anything a car will drive or park on needs 150 mm, and a driveway carrying a van at the front edge of the drive is better at 150–200 mm in two compacted layers of 75–100 mm each.

The calculator converts your sub-base depth into tonnes at 1.8 tonnes per cubic metre — a typical compacted figure for MOT Type 1 — and shows both tonnes and 850 kg bulk bags. Bulk bags are the practical unit for most domestic jobs: a 6 m × 4 m patio at 100 mm is 4.32 tonnes, or six bulk bags. The sub-base guide takes the same job through a patio, a driveway and a shed base.

Bedding and pointing

Sharp sand, not building sand, is used for the bedding layer: it compacts evenly and does not shrink away as much. A 40 mm bed is standard, laid slightly proud and screeded level. Sharp sand also runs at about 1.6 tonnes per cubic metre — noticeably heavier per cubic metre than the sub-base, which catches people out.

For pointing, a brush-in polymeric jointing compound is the quickest option and is calculated by area rather than by joint length; traditional mortar pointing is cheaper in materials but slower and harder to get right. Either way, build a fall of about 1:60 to 1:80 away from the house so water never sits on the surface.

Worked example: a 5 m × 4 m patio

A 5 m × 4 m patio — 20 m² — in 600 × 600 mm slabs with 10 mm joints, laid on 100 mm of MOT Type 1 over a 40 mm bedding course, with 10% waste.

How we got there

  1. 9 slabs across × 7 down = 63 full slabs — 600 × 600 mm slabs with 10 mm joints cover a 20 m² patio as 9 across and 7 down, which is 63 slabs.
  2. 63 + 10% waste = 70 slabs — The waste allowance covers cuts at the edges and breakages, taking the order to 70 slabs.
  3. MOT Type 1 sub-base: 3.60 tonnes — At 100 mm deep over 20 m², that is 3.60 tonnes — about 5 bulk bags.
  4. Bedding sand: 1.28 tonnes — 40 mm of sharp sand for bedding comes to 1.28 tonnes, or 2 bulk bags.
  5. Edge restraint: 18 m — The perimeter is 18 m, and it needs a restraint and a concrete haunch.

What you need to buy

The order for the worked example above, straight from this calculator's own shopping list.

Figures for the worked example only. Change the measurements above and the list recalculates.

Waste and over-ordering

The calculator adds 10% to the slab count for cuts and breakages. Raise it if you are laying a diagonal or circular pattern, or working around many edges — those jobs cut far more slabs than a plain rectangle.

Paving FAQs

How many slabs do I need for a 6 m × 4 m patio?

With 600 × 600 mm slabs and 10 mm joints: 77 slabs. That is 10 across by 7 down (70 slabs) plus 10% for cuts and breakages. Order the extra — a breakage mid-lay with the merchant shut is a miserable afternoon.

How much MOT Type 1 do I need?

Multiply the area by the compacted depth. A 24 m² patio at 100 mm is 2.4 m³, which at 1.8 t/m³ is 4.32 tonnes — about six 850 kg bulk bags. Order it a little generously; spreading sub-base is much easier than discovering you are 200 kg short.

How deep should the sub-base be for a driveway?

150 mm compacted is the minimum for a domestic car, laid in two layers of 75 mm and compacted between each. If a heavier vehicle will use it, or the ground beneath is soft clay, go deeper — 200 mm or more, with a geotextile membrane under the sub-base.

How much sharp sand do I need for bedding?

Same method: area × depth. A 24 m² patio at a 40 mm bed is 0.96 m³, which at 1.6 t/m³ is 1.54 tonnes — about 62 bags of 25 kg, or two bulk bags. Buying in bulk bags is far cheaper if you have somewhere to keep it dry.

Do I need a patio to slope?

Yes. A fall of roughly 1:60 to 1:80 away from the building keeps water moving and stops puddles. That is 12–20 mm of fall across a 1 m width. Set the fall in the sub-base and in the bedding layer, not by tilting individual slabs.

Regs & planning for this calculator

A patio is a hard surface, a drainage decision and a level decision all at once.